Quality Assurance
- Ensuring Consistent Quality and Reliability
|
Quality System
Steerprop has management certificates for ISO9001, ISO14001 and OHSAS18001.
|
Factory
Acceptance Tests
All Steerprop units undergo a factory acceptance
test, before leaving the workshop. The object of
the tests is to ensure that the propulsors have
been built according to design, that the gears are
according to design and correctly installed and
to ensure that the control system is working correctly.
|
--
Full Torque Test
To ensure the infinite lifetime of the gears it
is of utmost importance that a full torque test
is performed, in order to check that the gear contact
patterns are correct in both unloaded and fully
loaded conditions.
|
| |
click
for enlargement
Unloaded
contact patterns on the
lower gear teeth
|
click
for enlargement

Loaded
contact patterns on the
lower gear teeth
|
| |
-- Running Test
A running test at nominal rpm is also performed,
where the complete propulsor is mounted on the test
bench and run with until lubrication oil temperature
reaches 75°C.
During this test the complete power train,
|
|
| |
including
bearings is checked for possible installation or manufacturing
errors, misalignments etc.
|
Control System Test
At the factory acceptance test each propulsor
is controlled by the same controls that are delivered
with the propulsor. Thus the complete control system
and instrumentation as well as steering system can
be throrughly checked and is faultless when leaving
the factory.
|